CHECKIT Description

What is CHECKIT?

CHECKIT! is the combination of a checklist system for all in-office aspects of architectural design, documentation and project administration, and a simple, easy-to-use progress reporting system based on the checklists.

CHECKIT! is intended to be customised on a project-by-project basis. This customising is achieved primarily by use of the “check box” at the right side of each checklist item, where the principal or project manager goes through the entire checklist and makes a decision as to whether or not the checklist item is appropriate to the project. Items which are applicable are ticked.

The system also has extra space at the bottom of many of the checklists, permitting the addition of additional checklist items unique to the project. The tab-indexed checklist sheets are designed to last for more than one project. If users prefer to re-use the tab sets on multiple projects, they should customise the checklists with an erasable pen or pencil.

Alternatively, sets may be permanently coded to suit specific projects, and the tab sets maintained as part of the permanent project record.

How It Works

CHECKIT! organises the tasks common to most projects into sequential phases of a typical project, beginning with “Pre-Agreement” (what to do before the design contract is executed) and continuing through to “Post Contract Evaluation” (what to do when the project is finished).

There are 26 phases, counted from A to Z. The system provides for up to 28 tasks per phase. CHECKIT! purposely does not include many of the tasks that architects would routinely do anyway; it is designed to prompt attention to the coordination aspects of managing a project.

The system is particularly designed to assist less experienced team leaders in taking care of the hundreds of diverse tasks required by an architectural commission; as well as to remind the busy seasoned professional of the items that might be accidentally overlooked.

The fundamental concept of CHECKIT! is that we all recognise the value of checklists, but that without a strict requirement to refer to them periodically, we tend to lose them, to let them drift down to the “bottom of the pile”.

CHECKIT! does not permit a casual approach to checklists.

CHECKIT! does not get lost, because it is impossible for the Team Leader to complete his/her periodic report – whether it be weekly, fortnightly or monthly, without it. Excellent checklist systems go unused because no-one is required to use them on an incremental basis. CHECKIT!, properly used, overcomes that problem.

Using CHECKIT!

To use the CHECKIT! system, print a quantity of the Project Quality Report forms (see template below). We suggest printing the 26 checklists on 200gsm stock, punch them and put them in a ring binder. We also suggest using an A-Z set of tab dividers for each checklist and the corresponding Report forms as they are completed.

Performing a check

Circle the letter at the top of the Report form corresponding to the Checklist Group you are using. Simply fill out the “actions taken” since the last reporting period in the first column, and note “actions required” in the second column. When complete, make a copy and circulate to your Principal-In-Charge, or whoever in your office has project responsibility.

Generally speaking, most projects will have task activities going on in more than one phase at anyone time. Use as many phases as you need, completing one set of Report sheets for each phase. As you complete each task, initial it with the date: this is a “sign-off” indication; which means that you do not have to return to this item unless some action of the project forces a re-consideration of that item. Obviously, the system is designed to encourage the user to complete the tasks of any Group so as to be able to sign off on all of them.

CHECKIT! items which are not ticked should be marked as NA (not applicable) in the report, so reviewers will know the item has not been ignored.

References

Throughout the CHECKIT! system, it is necessary to confirm that some aspect of a previously listed checkpoint. To avoid constant referencing back to these points, key words are used where feasible to recall the reference. All such references will also contain the reference in brackets, e.g. (E 22) for use in case one needs to go back and refer to the complete item.

 

Return to Knowledge Library

玻璃钢生产厂家玻璃钢雕塑环保吗玻璃钢咖啡杯雕塑价格嘉兴玻璃钢陶瓷雕塑制作山西玻璃钢牛雕塑浏阳玻璃钢造型雕塑小型玻璃钢雕塑安装图解海南玻璃钢佛像雕塑厂家玻璃钢雕塑是什么颜色曲阳玻璃钢雕塑佛像玻璃钢雕塑蔬菜三门峡室内玻璃钢彩绘雕塑公司玻璃钢花盆主要材料价值观玻璃钢卡通雕塑生产厂家北京主题商场美陈厂家直销玻璃钢景观雕塑材质吕梁玻璃钢雕塑公司彭水玻璃钢雕塑商场玻璃顶吊饰美陈句容玻璃钢气球雕塑土地雕塑翻制玻璃钢流程当阳玻璃钢雕塑厂家白城卡通玻璃钢雕塑价格深圳商业商场美陈厂家直销玻璃钢麻将雕塑年中庆商场美陈北京多彩玻璃钢雕塑价位河北户外商场美陈生产公司河源玻璃钢雕塑造型郑州玻璃钢雕塑工业玻璃钢卡通雕塑价格报价香港通过《维护国家安全条例》两大学生合买彩票中奖一人不认账让美丽中国“从细节出发”19岁小伙救下5人后溺亡 多方发声单亲妈妈陷入热恋 14岁儿子报警汪小菲曝离婚始末遭遇山火的松茸之乡雅江山火三名扑火人员牺牲系谣言何赛飞追着代拍打萧美琴窜访捷克 外交部回应卫健委通报少年有偿捐血浆16次猝死手机成瘾是影响睡眠质量重要因素高校汽车撞人致3死16伤 司机系学生315晚会后胖东来又人满为患了小米汽车超级工厂正式揭幕中国拥有亿元资产的家庭达13.3万户周杰伦一审败诉网易男孩8年未见母亲被告知被遗忘许家印被限制高消费饲养员用铁锨驱打大熊猫被辞退男子被猫抓伤后确诊“猫抓病”特朗普无法缴纳4.54亿美元罚金倪萍分享减重40斤方法联合利华开始重组张家界的山上“长”满了韩国人?张立群任西安交通大学校长杨倩无缘巴黎奥运“重生之我在北大当嫡校长”黑马情侣提车了专访95后高颜值猪保姆考生莫言也上北大硕士复试名单了网友洛杉矶偶遇贾玲专家建议不必谈骨泥色变沉迷短剧的人就像掉进了杀猪盘奥巴马现身唐宁街 黑色着装引猜测七年后宇文玥被薅头发捞上岸事业单位女子向同事水杯投不明物质凯特王妃现身!外出购物视频曝光河南驻马店通报西平中学跳楼事件王树国卸任西安交大校长 师生送别恒大被罚41.75亿到底怎么缴男子被流浪猫绊倒 投喂者赔24万房客欠租失踪 房东直发愁西双版纳热带植物园回应蜉蝣大爆发钱人豪晒法院裁定实锤抄袭外国人感慨凌晨的中国很安全胖东来员工每周单休无小长假白宫:哈马斯三号人物被杀测试车高速逃费 小米:已补缴老人退休金被冒领16年 金额超20万