Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.

Similar presentations


Presentation on theme: "Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008."— Presentation transcript:

1 Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008 Chinook Systems, Inc.

2 Topics Commissioning Specifications Commissioning Specification Coordination Related Sections ©2008 Chinook Systems, Inc.

3 Commissioning Specifications What is a Commissioning Specification? – Relays the expectations and requirements of Commissioning to the contracting team Outlines the Process and Procedures from a contractual perspective Provides enough detail for a Contractor to clearly understand the level of effort and put a fair price to the scope of work – Includes documents in Division 1, 15, and 16 Could also include 13, 17, etc… Could also include references in other coordinating sections and divisions i.e. training, O&M Manuals, record documents – Define Roles and Responsibilities Division 1 binds the General Contractor as well as sample documentation Other sections are the respective sub-contractors all related back to Division 1 ©2008 Chinook Systems, Inc.

4 Commissioning Specification So what really goes into each section? – Anything to accurately relay the intent and requirements of the contractor for this project Includes detailed definitions (i.e. Defines what a “deficiency” and “retesting” are) – Defines the exact requirements for Closeout, Warranty and Training Does not repeat information from those particular sections – FILLS IN THE GAP!!! – Anything that could cost the contractor money or time needs to be identified ©2008 Chinook Systems, Inc.

5 Commissioning Specifications So what is the difference between a Plan and the Spec? – The spec typically does not change Plan is a living document Allows for dynamics in the process of getting from A-Z – As it relates to process, the spec speaks in generalities and references the Plan Plan is specific and detailed – Contractor bids the specification Plan is used a reference tool to be used in conjunction with the specification ©2008 Chinook Systems, Inc.

6 Specification Coordination What is the purpose? – Incorporates Commissioning into ALL related sections – Requires coordination and interaction between the CxA and the A/E specification builder – Performed as part of the CxA design review Back checked before bid documents – Fills in the gaps between disciplines and even between sections within the same division – For LEED projects, ensures any LEED Cx requirements are incorporated ©2008 Chinook Systems, Inc.

7 Specification Coordination Approach – “What would I need in this document to….?” Test, maintain, operate, and commission – Looking to ensure that the requirements to properly operate, maintain, and commission the equipment and systems are defined Not looking from the design team perspective but from the O&M, testing agency perspective ©2008 Chinook Systems, Inc.

8 Specification Coordination Division 1 – Incorporates all related sections to the Commissioning section(s) – Review the requirements of: Demonstration and Training Closeout Submittals Operations and Maintenance Warranty ©2008 Chinook Systems, Inc.

9 Specification Coordination Division 15 and 16 – Coordinate the requirements of other disciplines Building Automation System (Div 15) Fire Alarm (Div 13) Telecom and Security (Div 17) Miscellaneous systems – Spare parts are defined ©2008 Chinook Systems, Inc.

10 Specification Coordination Division 15 and 16 – Ask the design team specific questions about any contradictions between plans and spec Use their knowledge of the intent to define what is shown – Use the OPR and/or BOD to drive questions NOT personal preference, “I would do this…” or “I would prefer this…” – Code interpretation – Lessons Learned ©2008 Chinook Systems, Inc.

11 Specification Coordination Division 15 – Building Automation System Coordinate device specified for an application CT sensor on belt driven equipment Tolerances for devices Accuracy in measurement and verification as well as control Coordinate points list with devices specified Integration points with other systems i.e. F/A, CRACs – Verify contractor required testing is present and standard(s) provided ©2008 Chinook Systems, Inc.

12 Specification Coordination Division 15 – Testing, Adjusting, and Balancing Proper submittal requirements Review of the construction documents with comments Proposed testing approach Certifications and Qualifications Sampling of TAB results ©2008 Chinook Systems, Inc.

13 Specification Coordination Division 16 – Confirm that settings and setpoints are defined ATS transfer times and values EM&CS event logging values Coordination study required? – Verify that the equipment specified and the testing required can be completed Backpressure testing on a generator needs a port at the manifold ©2008 Chinook Systems, Inc.

14 Specification Coordination Division 16 – NETA testing or similar are defined not just called for Standard versus optional tests What tests are of value to the owner as opposed to boiler plate – Certification and requirements of the testing agency NETA or NICET independent third party ©2008 Chinook Systems, Inc.

15 Related Sections What effort is there for the CxA in… – Demonstration and Training specification Define the level of expectation directly with the owner and O&M staff – Classroom, site, slide presentation Develop topics and who will present – System overview = Design team – Equipment = Qualified manufacturer representatives Final repeatable format – DVD, interactive, web-based ©2008 Chinook Systems, Inc.

16 Related Sections What effort is there for the CxA in… – Operations and Maintenance specification Define what type of information is provided based on equipment and systems – Requirement for generators and chillers may not apply to plumbing fixtures and BAS – Are emergency operation manuals required? System level manuals required? Define what the review process shall be – 1 hardcopy with threaded conversation for comments – 1 Final hardcopy with electronic submission on CD ©2008 Chinook Systems, Inc.

17 Related Sections What effort is there for the CxA in… – Warranty specification Assists in defining the lengths of coverage for specific equipment and components Typically based on O&M experience Extracted from owner and O&M staff – Special warranty periods are identified beyond standard manufacturer provided – Closeout submittal specification Define how as-built documentation is delivered ©2008 Chinook Systems, Inc.

18 Related Sections Just like the Commissioning Specifications… …leave the Division 1 sections to define the requirements …coordinate with the Division 15 and 16 Cx sections Allows the general contractor to be responsible for the delivery and overall requirements Defines the individual sections for the particular sub- contractor ©2008 Chinook Systems, Inc.

19 Recap Commissioning authority’s role in developing specific specifications is quite intensive Define the cost and time associated with performing commissioning to the contractor – Give them something to bid on Allow the Commissioning authority to assist in properly coordinating the specification ©2008 Chinook Systems, Inc.

20 Wrap-up Questions and Answer Session Derek De Jesús, CxA Chinook Systems, Inc. 2001 Jefferson Davis Hwy, Suite 905 Arlington, VA 2202 703-232-6537 ddjesus@chinooksystems.com ©2008 Chinook Systems, Inc.


Download ppt "Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008."

Similar presentations


Ads by Google

玻璃钢生产厂家江西大型玻璃钢雕塑价位贵阳玻璃钢雕塑厂哪家好玻璃钢古人物雕塑江苏通用玻璃钢雕塑价格如何计算庆阳彩色玻璃钢雕塑郑州玻璃钢雕塑有哪些凌源玻璃钢雕塑各个大型商场的国庆美陈布置南昌户外玻璃钢雕塑广州玻璃钢人像雕塑台湾玻璃钢人物雕塑厂家宜兴商场美陈商场美陈简约涞源玻璃钢花盆花器洛龙玻璃钢雕塑费用深圳户内玻璃钢雕塑优势玻璃钢花盆制作设备德州镂空玻璃钢雕塑玻璃钢雕塑联合展郑州铜玻璃钢彩绘雕塑定做价格中山玻璃钢卡通雕塑厂家湖南玻璃钢雕塑大全合肥景区玻璃钢雕塑供应商四川玻璃钢雕塑摆件销售企业玻璃钢雕塑作品制作人物玻璃钢雕塑推荐厂家欧式玻璃钢雕塑施工哪家好景观玻璃钢雕塑批发代理武都玻璃钢雕塑定做室内商场美陈生产公司香港通过《维护国家安全条例》两大学生合买彩票中奖一人不认账让美丽中国“从细节出发”19岁小伙救下5人后溺亡 多方发声单亲妈妈陷入热恋 14岁儿子报警汪小菲曝离婚始末遭遇山火的松茸之乡雅江山火三名扑火人员牺牲系谣言何赛飞追着代拍打萧美琴窜访捷克 外交部回应卫健委通报少年有偿捐血浆16次猝死手机成瘾是影响睡眠质量重要因素高校汽车撞人致3死16伤 司机系学生315晚会后胖东来又人满为患了小米汽车超级工厂正式揭幕中国拥有亿元资产的家庭达13.3万户周杰伦一审败诉网易男孩8年未见母亲被告知被遗忘许家印被限制高消费饲养员用铁锨驱打大熊猫被辞退男子被猫抓伤后确诊“猫抓病”特朗普无法缴纳4.54亿美元罚金倪萍分享减重40斤方法联合利华开始重组张家界的山上“长”满了韩国人?张立群任西安交通大学校长杨倩无缘巴黎奥运“重生之我在北大当嫡校长”黑马情侣提车了专访95后高颜值猪保姆考生莫言也上北大硕士复试名单了网友洛杉矶偶遇贾玲专家建议不必谈骨泥色变沉迷短剧的人就像掉进了杀猪盘奥巴马现身唐宁街 黑色着装引猜测七年后宇文玥被薅头发捞上岸事业单位女子向同事水杯投不明物质凯特王妃现身!外出购物视频曝光河南驻马店通报西平中学跳楼事件王树国卸任西安交大校长 师生送别恒大被罚41.75亿到底怎么缴男子被流浪猫绊倒 投喂者赔24万房客欠租失踪 房东直发愁西双版纳热带植物园回应蜉蝣大爆发钱人豪晒法院裁定实锤抄袭外国人感慨凌晨的中国很安全胖东来员工每周单休无小长假白宫:哈马斯三号人物被杀测试车高速逃费 小米:已补缴老人退休金被冒领16年 金额超20万

玻璃钢生产厂家 XML地图 TXT地图 虚拟主机 SEO 网站制作 网站优化