LEED commissioning requirements

LEED is a green building certification system. To get the highest credit score, you need to have a commissioning process implemented.
While commissioning is not necessarily a required part of every project, it is indeed required if a team seeks LEED certification.

Table of content

Icon What is the LEED and who uses it?
Icon Achieving LEED Certification with Commissioning Efforts
Icon LEED Commissioning Requirements
Icon Cx Prerequisite: Fundamental Commissioning
Icon Cx Credit Opportunity: Enhanced Commissioning
Icon Frequently Asked LEED Commissioning Questions
Why you should use the commissioning process.

Icon What is the LEED and who uses it?

LEED stands for Leadership in Energy and Environmental Design. The LEED program was established in 1998 by the US Green Building Council (USBGC) to lay the framework for more sustainable, efficient, and environmentally-friendly building design and construction.

Developers and owners seek to earn LEED certification for their projects as it is not only an honorable achievement, but the program produces higher-performing building structures.

The LEED program is continuously refined to meet new industry standards. LEED v4 is the most current version, introduced in 2013. It includes requirements and opportunities for LEED credits through commissioning and presents new LEED requirements to commissioning.

Icon Achieving LEED Certification with Commissioning Efforts

Commissioning is essential in building design and during the construction phase. A robust commissioning plan ensures a project meets performance expectations and easily transitions into the operation and maintenance stage.

While commissioning is not necessarily a required part of every project, it is indeed required if a team seeks LEED certification. LEED has established specific commissioning-related tasks that must be completed to achieve certification, meaning the commissioning impact on LEED is substantial.

Icon LEED Commissioning Requirements

LEED requirements are divided into nine different credit categories. In order to achieve credits in a specific category, all of the prerequisites must be met first.

For example, LEED commissioning credits in the Energy and Atmosphere category have prerequisites in Fundamental Commissioning and credit opportunities in Enhanced Commissioning, worth up to 6 points towards LEED certification.

The commissioning credit opportunities make it possible to get a better LEED score with commissioning.

Icon Cx Prerequisite: Fundamental Commissioning

Fundamental LEED Commissioning is a prerequisite. These LEED activities in the commissioning process must be met in the project to earn credits in the Energy and Atmosphere category.

Fundamental activities

Fundamental Commissioning requires all of the following commissioning (Cx) tasks for mechanical, electrical, plumbing, and renewable energy systems and assemblies in accordance with ASHRAE Guideline 0-2013 and ASHRAE Guideline 1.1–2007 for HVAC&R Systems.

  • Review the owner’s project requirements (OPR), basis of design (BOD), and project design.
  • Develop and implement a Cx plan.
  • Confirm incorporation of Cx requirements into the construction documents.
  • Develop construction checklists.
  • Develop a system test procedure.
  • Verify system test execution.
  • Maintain an issues and benefits log throughout the Cx process.
  • Prepare a final Cx process report.
  • Document all findings and recommendations and report directly to the owner throughout the process.

CxA qualifications

A qualified commissioning authority (CxA) must be appointed to manage these commissioning activities in LEED by the end of the design development phase. Often the CxA will be using a software solution to manage the process.

In addition to the above requirements during project design and construction, the team must prepare and maintain a facilities requirements and operations and maintenance plan, including the following.

  • A sequence of operations for the building
  • The building occupancy schedule
  • Equipment run-time schedules
  • Setpoints for all HVAC equipment
  • Set lighting levels throughout the building
  • Minimum outside air requirements
  • Any changes in schedules or setpoints for different seasons, days of the week, and times of day
  • A systems narrative describing the mechanical and electrical systems and equipment
  • A preventive maintenance plan for building equipment described in the systems narrative
  • A commissioning program that includes periodic commissioning requirements, ongoing commissioning tasks, and continuous tasks for critical facilities

Icon Cx Credit Opportunity: Enhanced Commissioning

Project teams can earn LEED credits through additional commissioning-related tasks in Enhanced Commissioning if all of the above Fundamental Commissioning requirements are met.

Enhanced LEED Commissioning has two options for credits: Option 1 - Enhanced Systems Commissioning, worth 3-4 points, and Option 2 - Building Enclosure Commissioning, worth 2 points. If both options are achieved, a total of 6 points can be earned through Enhanced Commissioning.

Why you should use the commissioning process.

Option 1 - Enhanced Systems Commissioning

Option 1 - Enhanced Systems Commissioning is comprised of two separate paths.

Path 1: Enhanced Commissioning is worth 3 points and requires the commissioning authority to complete the following.

  • Review contractor submittals.
  • Verify inclusion of systems manual requirements in construction documents.
  • Verify inclusion of operator and occupant training requirements in construction documents.
  • Verify systems manual updates and delivery.
  • Verify operator and occupant training delivery and effectiveness.
  • Verify seasonal testing.
  • Review building operations 10 months after substantial completion.
  • Develop an on-going commissioning plan.
  • Include all enhanced commissioning tasks in the OPR and BOD.

Path 2: Enhanced and Monitoring-Based Commissioning is worth 4 points if the team develops a monitoring-based plan to measure and evaluate the performance of energy- and water-consuming systems and all of the Path 1 requirements are satisfied.

The procedures and measurement points in the monitoring-based plan must include the following.

  • Roles and responsibilities
  • Measurement requirements (meters, points, metering systems, data access)
  • The points to be tracked, with frequency and duration for trend monitoring
  • The limits of acceptable values for tracked points and metered values (where appropriate, predictive algorithms may be used to compare ideal values with actual values)
  • The elements used to evaluate performance, including conflict between systems, out-of-sequence operation of systems components, and energy and water usage profiles
  • An action plan for identifying and correcting operational errors and deficiencies
  • Training to prevent errors; planning for repairs needed to maintain performance
  • The frequency of analyses in the first year of occupancy (at least quarterly)

Option 2 - Building Enclosure Commissioning

Option 2 - Building Enclosure Commissioning is worth 2 points, bringing the total number of possible points for Enhanced Commissioning to 6 points. It can be completed with Option 1 or separately.

The team must fulfill the requirements of Fundamental Commissioning as they relate to the building's thermal envelope and complete the following commissioning tasks for the building's thermal envelope in accordance with ASHRAE Guideline 0 and ASTM E2947-16: Standard Guide for Building Enclosure Commissioning.

  • Review contractor submittals.
  • Verify inclusion of systems manual requirements in construction documents for enclosure systems.
  • For specialty enclosure systems with controls and automation:
    • Verify inclusion of operator and occupant training requirements in construction documents.
    • Verify systems manual updates and delivery.
    • Verify operator and occupant training delivery and effectiveness.
    • Verify seasonal testing.
    • Review building operations 10 months after substantial completion.
  • Develop an on-going enclosure commissioning plan for maintenance, renewal, and revitalization cycles.

Icon Frequently Asked LEED Commissioning Questions

What is a LEED commissioning authority?

A LEED commissioning authority (CxA) is responsible for leading a project's entire commissioning process, from design to turnover.

To be compliant with LEED requirements, the CxA must have the following qualifications:

  • Have commissioning process experience on at least two building projects with a similar scope of work, from early design phase through at least 10 months of occupancy.
  • Be an employee of the owner, an independent consultant, or an employee of the design or construction firm who is not part of the project's design or construction team, or a disinterested subcontractor of the design or construction team.
  • For projects smaller than 20,000 square feet (1,860 square meters), the CxA may be a qualified design or construction team member. The CxA must report their findings directly to the owner in all cases.

Is commissioning a LEED requirement?

Commissioning is a LEED requirement in order to earn points in the Energy and Atmosphere category. To receive credits in this category, project teams must adhere to the commissioning provisions outlined in Fundamental Commissioning and Enhanced Commissioning.

While commissioning is not necessarily a requirement, it presents itself as an opportunity to earn up to 6 points toward LEED certification.

What is the difference between enhanced and fundamental commissioning?

Fundamental Commissioning is a LEED prerequisite that requires commissioning activities for mechanical, electrical, plumbing, and renewable energy systems and assemblies.

Fundamental Commissioning requirements must first be met to qualify for Enhanced Commissioning credits. Enhanced Commissioning is worth up to 6 points towards LEED certification. It outlines various requirements for Enhanced Systems Commissioning and Building Enclosure Commissioning.

Sign up and become part of the Cx network and upgrade your skills

玻璃钢生产厂家玻璃钢雕塑企业吉祥物定制如何选购玻璃钢花盆卫辉玻璃钢雕塑价格玻璃钢卡通雕塑展电话呈贡玻璃钢雕塑设计制作哪里有西安公园玻璃钢雕塑订做价格黔南商场美陈雕塑厂家广东节庆商场美陈厂家直销廊坊大型玻璃钢花盆报价蚌埠抽象玻璃钢雕塑价位弥勒市玻璃钢雕塑供应保山玻璃钢雕塑设计玻璃钢雕塑十二生肖哪家有甘肃卡通玻璃钢雕塑北京玻璃钢雕塑公司方案玻璃钢雕塑制作教材光盘玻璃钢欧式女神雕塑广东省玻璃钢雕塑厂家宁夏仿真人物玻璃钢雕塑定做个性化玻璃钢雕塑供应商重庆市玻璃钢雕塑石家庄学校玻璃钢雕塑厂家昌邑玻璃钢人物雕塑长乐玻璃钢关公雕塑楼盘玻璃钢雕塑生产厂家肥西玻璃钢雕塑厂家阳江玻璃钢卡通雕塑三门峡镂空玻璃钢雕塑厂家重庆玻璃钢海洋雕塑安徽步行街玻璃钢雕塑设计香港通过《维护国家安全条例》两大学生合买彩票中奖一人不认账让美丽中国“从细节出发”19岁小伙救下5人后溺亡 多方发声单亲妈妈陷入热恋 14岁儿子报警汪小菲曝离婚始末遭遇山火的松茸之乡雅江山火三名扑火人员牺牲系谣言何赛飞追着代拍打萧美琴窜访捷克 外交部回应卫健委通报少年有偿捐血浆16次猝死手机成瘾是影响睡眠质量重要因素高校汽车撞人致3死16伤 司机系学生315晚会后胖东来又人满为患了小米汽车超级工厂正式揭幕中国拥有亿元资产的家庭达13.3万户周杰伦一审败诉网易男孩8年未见母亲被告知被遗忘许家印被限制高消费饲养员用铁锨驱打大熊猫被辞退男子被猫抓伤后确诊“猫抓病”特朗普无法缴纳4.54亿美元罚金倪萍分享减重40斤方法联合利华开始重组张家界的山上“长”满了韩国人?张立群任西安交通大学校长杨倩无缘巴黎奥运“重生之我在北大当嫡校长”黑马情侣提车了专访95后高颜值猪保姆考生莫言也上北大硕士复试名单了网友洛杉矶偶遇贾玲专家建议不必谈骨泥色变沉迷短剧的人就像掉进了杀猪盘奥巴马现身唐宁街 黑色着装引猜测七年后宇文玥被薅头发捞上岸事业单位女子向同事水杯投不明物质凯特王妃现身!外出购物视频曝光河南驻马店通报西平中学跳楼事件王树国卸任西安交大校长 师生送别恒大被罚41.75亿到底怎么缴男子被流浪猫绊倒 投喂者赔24万房客欠租失踪 房东直发愁西双版纳热带植物园回应蜉蝣大爆发钱人豪晒法院裁定实锤抄袭外国人感慨凌晨的中国很安全胖东来员工每周单休无小长假白宫:哈马斯三号人物被杀测试车高速逃费 小米:已补缴老人退休金被冒领16年 金额超20万